The expert points out: when the towed to small portable concrete pump in the pipes must need to pay attention to a few key points, so as to ensure the construction process.Then towed to pump in the process of laying pipeline whether to grasp the key points which a few?Specifically, towed to pump piping layout can be implemented from the following several aspects.
1, should be disposed towed to cement mixers tubing to ensure smooth pumping and under the premise of a normal delivery, to shorten the length and reduce the bend to reduce drag delivery.
2, it is best to contact the cone in front of more than two meters of straight pipe before using the elbow, should ensure a straight pipe axis coincides with the axis of the cone, and achieve reliable fixation to disassemble and clean the cone after fast loading back.
3, each line must be connected firmly, bend place must be added a strong fixtures, horizontal line must set up a solid point per 10 metres spacing, tube card hoop to impending, in order to open and take over the road.Each band must be fastened in place to ensure joint sealing closely, do not leak slurry, water.
4, according to take over the site concrete batch plant construction conditions and requirements, reasonable decorate line in order to eliminate hidden dangers.